Existing battery bank
Cell/module count, voltage, chemistry, capacity and the existing rack layout form the starting point.
03 / Services
Replacement must fit the site's operational schedule. UPS and other critical installations require clear separation of tasks and responsibilities.
TECHNICAL CONTEXT
Replacing batteries means comparing what is installed today with the new units. In UPS/no-break and stationary DC systems, the electrical layout, space constraints and work window need to be planned together.
Overall project process ↗Cell/module count, voltage, chemistry, capacity and the existing rack layout form the starting point.
Dimensions, terminals, connections, weight and manufacturer requirements must fit the equipment.
Phased replacement or planned downtime is assessed with the operator; interruption-free changeover cannot be assumed.
OBAM takes out the old batteries, installs and connects new ones and transports removed units to the agreed partner.
PRACTICAL QUESTIONS
These questions address the specific requirements of this service.
Yes. Electrical connection is normally included. Switching, commissioning and any further verification are agreed with the site operator.
Not automatically. This depends on system architecture and available redundancy; we review the feasible work window first.